• RESOURCE TABLES & GRADES

MACY PROJECT – RESOURCE TABLES & GRADES

Symbol has completed a localised drilling campaigns, which have defined and Indicated and Inferred JORC Resource of 132,700t at18.3% Zn and 2.1%Pb at the Macy Deposit

Table 1. Indicated and Inferred JORC Resource at the Macy Deposit

Macy Zinc Resource
Category Tonnes Zn% Pb% % of Total
Indicated 104,300 19.0 2.2 85
Inferred 18,000 20.0 2.7 15
TOTAL 122,300 19.2 2.3 100
Reported under 2012 JORC using a Zinc cut-off grade of 2%
Macy Lead Resource
Category Tonnes Pb% Zn% % of Total
Indicated 5,500 24.44 11.11 53%
Inferred 4,900 30.24 5.94 47
TOTAL 10,400 27.18 8.25 100
Reported under 2012 JORC using a Lead cut-off grade of 2%

JORC Resource completed by Competent Person Lyn Windenbar and Associates.  Assays completed by Intertek (Perth). Refer to the ASX Announcement released to ASX on 22 March 2018 for more details on the JORC Resource.

There have been 28 diamond holes drilled for a total of 2,484m at the Macy Deposit. The key drill intersections are summarised in tables 1 and 2 below.

One of the most northerly Macy Deposit drill holes, SDD 020, returned 9.4m at 39.3% Zn from 29.6m (with a true width of approximately 6m) thereby underlining the mineralisation potential to the north. The October 2017 drilling program will rigorously test the northerly potential.

Table 2: Macy Deposit key drill intersections

Zinc lode intersections
HoleID From To Thickness* Zn % Pb % East North RL
SDD025 65.82 70.10 4.28m 51.70% 2.14% 698,077.76 1,060,662.40 347.90
SDD023 66.30 67.30 1.00m 43.39% 5.41% 698,057.10 1,060,707.50 344.65
SDD020 29.60 39.00 9.40m 39.31% 0.14% 698,041.90 1,060,752.29 371.49
SDD026 41.80 47.90 6.10m 36.05% 3.31% 698,097.14 1,060,606.99 361.72
SDD017 27.00 38.00 11.00m 23.52% 0.64% 698,094.85 1,060,634.18 373.23
SDD011 47.00 60.00 13.00m 23.03% 1.16% 698,090.02 1,060,635.91 359.02
SDD021 30.20 38.03 7.83m 22.29% 0.22% 698,049.05 1,060,728.93 373.43
SDD013 48.00 62.26 14.26m 19.32% 1.30% 698,046.51 1,060,728.87 354.92
SDD022 33.18 36.75 3.57m 19.15% 15.31% 698,057.74 1,060,707.20 372.82
Lead  lode intersections
HoleID From To Thickness* Pb % Zn % East North RL
SDD012 33.70 34.00 0.30m 65.43% 3.70% 698,074.39 1,060,685.06 374.07
SDD020 24.96 25.32 0.36m 37.81% 3.17% 698,046.39 1,060,754.40 379.20
SDD017 17.00 18.00 1.00m 33.55% 0.41% 698,102.45 1,060,637.89 385.62
SDD014 51.00 51.50 0.50m 32.85% 3.91% 698,037.21 1,060,785.23 360.74
SDD025 63.24 64.24 1.00m 29.86% 0.76% 698,080.25 1,060,663.17 351.22
SDD013 28.40 28.75 0.35m 17.63% 0.26% 698,060.77 1,060,734.06 376.59
SDD011 41.40 42.00 0.60m 12.35% 4.50% 698,097.15 1,060,638.50 368.06

*Downhole thickness

Figure 1.  Key drill intersections at the Macy Deposit (source: ASX Announcement, 9 Jan 2018)

  

Figure 2.  Drilling section at the Macy Deposit (source: ASX Announcement, 9 Jan 2018)